About The Model Network For You Connect →
LIVE DATA

The grid, right now.

Real-time telemetry from Fayba Power operational nodes. High-fidelity data ensuring absolute reliability and zero downtime.

Victoria Court, Lekki Phase 1

Commissioning: Q3 2026

PRE-COMMISSIONING
SOLAR OUTPUT
kW
BATTERY SOC
%
LOAD DEMAND
kW
UPTIME (30-DAY)
%
!

Node 01 is currently in pre-commissioning. Telemetry values above are simulated based on our engineering projections for the Lekki Phase 1 site. Live data will be published upon commissioning in Q3 2026.

EXPANSION ROADMAP

Built to scale across Nigeria.

Q3 2026

Node 01 Commissioning

Lekki Phase 1 infrastructure rollout. Deployment strategy and site preparation currently underway to ensure 99.99% operational efficiency. Projected capacity: 250kW solar, 500kWh storage.

250kW Solar 500kWh LFP Lekki Phase 1
Q1 2027

Node 02 Commissioning

Scaling capacity to accommodate the Ikeja industrial corridor. Projected 1.2MW solar array with expanded distribution capability for high-density commercial loads.

1.2MW Solar 2.4MWh LFP Ikeja Industrial
PHASE 2

Mesh Network — Nigeria

Interconnecting standalone nodes into a resilient, self-healing microgrid infrastructure across major Nigerian commercial zones. Nodes communicate via encrypted telemetry to dynamically load-balance across the network.

Multi-node Self-healing Pan-Nigeria

Are you a power provider? Integrate your generation with the Fayba grid.

Partner With Us →