Real-time telemetry from Fayba Power operational nodes. High-fidelity data ensuring absolute reliability and zero downtime.
Commissioning: Q3 2026
Node 01 is currently in pre-commissioning. Telemetry values above are simulated based on our engineering projections for the Lekki Phase 1 site. Live data will be published upon commissioning in Q3 2026.
Lekki Phase 1 infrastructure rollout. Deployment strategy and site preparation currently underway to ensure 99.99% operational efficiency. Projected capacity: 250kW solar, 500kWh storage.
Scaling capacity to accommodate the Ikeja industrial corridor. Projected 1.2MW solar array with expanded distribution capability for high-density commercial loads.
Interconnecting standalone nodes into a resilient, self-healing microgrid infrastructure across major Nigerian commercial zones. Nodes communicate via encrypted telemetry to dynamically load-balance across the network.